Esedra Dafne Bed

DAFNE BED

Esedra Dafne Bed

DAFNE BED

Masterpiece of Bedroom

The masterpiece of the bedroom is the Dafne bed, with its smooth, rounded and finely padded headboard, where the leather of the rear part connects and embraces the fabric covering the front, creating a sensual and emotional curve.

Esedra Dafne Bed
Esedra Dafne Bed

The padded base structure can be covered both with leather or fabric.

INFORMATION

MATERIALS

- Wood
- Leather
- Fabric

MEASUREMENT

- Length : 233 cm
- Width : 186/206/226 cm
- Headboard Height : 103 cm
- Bed Height : 50 cm

Esedra Dafne Bed

COVERS

Fabric Covers Fully Removable. Leather Covers Not Removable.

BEDSPRING

Woode Slats

STRUCTURE

Frame in solide pine wood completed by multilayer wood panels. Upholstered with polyurethane foam and completed with second protective cover.

COVERING

Fabric, Leather Or Mix Version Leather/fabric.

NOTA

Mattress is optional.

DOWNLOAD

Catalogue

Esedra Dafne Bed